SB9 Development Los Angeles | Lot Splits & Multi-Unit | Arc Design Build
Arc Services

Double your property's
development potential.

California SB9 allows you to split a single-family lot into two parcels and build up to two units on each — potentially creating four income-producing homes on a single residential lot. Arc handles design, permits, and construction for every unit.

How We Build It

Our process.

01
Feasibility Assessment
We analyze your lot for SB9 eligibility: size, zone, exclusion categories, tenant status, and city-specific ordinances that may affect your project.
02
Lot Split Application
We prepare and submit the urban lot split application to the city, including survey documents, maps, and required findings.
03
Design & Architecture
Full architectural drawings for each new unit — floor plans, elevations, structural documents, and all permit-ready construction documents.
04
Permits & Approvals
Building permit submittals for all new units, Title 24 energy compliance, structural engineering, and plan check management.
05
Construction
Foundation, framing, and full construction of each new unit — tracked in Arc Studio with milestone photos and daily updates.
Custom Pricing – Based on scope
Typical range  ·  SB9 lot split + new construction in LA
Configure My SB9 Project
Free estimate  ·  No obligation  ·  Reply within 1 business day
Common Questions

Everything you need
to know.

Does every lot qualify for SB9?

No. SB9 excludes lots in historic districts, earthquake fault zones, high fire hazard severity zones, designated flood zones, and certain coastal zones. Lots with existing rent-controlled tenants also have significant restrictions. We conduct a full eligibility check before any design work begins.

How many units can I build under SB9?

SB9 allows up to two primary dwelling units per parcel. Combined with ADU rights, each parcel can potentially have a primary unit plus an ADU — creating up to four units total on the original lot. The exact count depends on your lot size and city ordinances.

Can I sell the split parcels separately?

Yes. One of the primary purposes of SB9 is to allow homeowners to sell the split parcel separately. This creates significant liquidity — you can sell the vacant parcel, develop it and sell, or keep both and rent all units.

How long does an SB9 project take?

A full SB9 project — lot split, design, permits, and construction of new units — typically takes 18–24 months. The lot split application adds 2–4 months before construction permits are issued.

What cities in LA County allow SB9?

All cities in California must comply with SB9 as state law. However, cities can add reasonable objective standards. We're experienced with the specific requirements of Los Angeles, Sherman Oaks, Encino, Tarzana, Studio City, and surrounding Valley cities.

Ready to get started
on your sb9 project?

Configure your project online and get a realistic budget estimate before your first call with us.