Full Home Remodels Los Angeles | Arc Design Build
Arc Services

Full home remodels.
One team, start to finish.

Whole-home interior transformations — new layout, flooring, kitchen, all bathrooms, doors, and trim. Arc handles everything under one contract.

$80,000 – $300,000+
Typical range  ·  Whole-home interior remodel in LA
Configure My Full Home Remodel Project
Free estimate  ·  No obligation  ·  Reply within 1 business day
About This Service

Full Home Remodels

A full home remodel is the most comprehensive project we build — and the one where project management matters most. When every room is in scope simultaneously, trade sequencing, materials lead times, and coordination determine whether a project finishes on schedule or turns into a year-long ordeal.

Arc's full home remodels are run by a dedicated project manager who sequences every trade, tracks every delivery, and keeps you updated through Arc Studio. You never chase a subcontractor or wonder what's happening at your house.

A typical full home remodel includes: new flooring throughout, kitchen gut-and-rebuild, all bathrooms updated, new interior doors and hardware, millwork and trim, paint, and any layout changes required. One contract, one team, one point of contact.

ServiceFull Home Remodels
Typical Range$80,000 – $300,000+
Typical Size800–4,000 sq ft
CSLB#1089234
Service AreaLos Angeles, CA
PermitsFully included
How We Build It

Our process.

01
Scope Session
We walk every room and build a complete scope document together. Every surface, fixture, and finish is decided before work starts.
02
Selections & Scheduling
Flooring, tile, cabinetry, fixtures, and hardware are selected and ordered before demo begins. Lead times are built in.
03
Demo & Rough-In
Full interior demo. Electrical panel often upgraded. Plumbing, MEP, and structural work completed and inspected first.
04
Flooring & Drywall
New flooring installed before cabinetry. Drywall hung, finished, and textured. Kitchen and bath tile begins.
05
Finishes & Punch List
Cabinets, countertops, fixtures, hardware, and appliances installed in sequence. Final paint, trim, punch list, and handover.
Common Questions

Everything you need
to know.

Can I live in my home during a full home remodel?

Depends on scope. For major remodels with kitchen and all baths simultaneously, most clients relocate for 10–16 weeks.

How do you handle sequencing across so many trades?

Our PM builds a master schedule before work begins. Trades are sequenced to prevent rework — flooring never before tile, cabinets never before plumbing inspection.

Do you provide a fixed-price contract?

Yes. Fixed-price with clearly defined material allowances. Change orders require written approval before work proceeds.

How long does a full home remodel take?

An 1,800–2,500 sq ft home typically takes 16–22 weeks after materials are ordered and permits are issued.

What is the most common mistake homeowners make?

Starting without finalizing all material selections. Undecided tile, fixtures, or cabinets stop entire trades and add weeks to the timeline.

Ready to build your
full interior project?

Configure your project online and get a realistic budget estimate before your first call with us.

Also building